Est. 1979 | 🕑 Mon–Fri 7am–5:30pm • Sat 8am–4pm | 📍 Airway Heights • Colville • Kettle Falls | ★ Leave a Review | ★ MILITARY & FIRST RESPONDER DISCOUNT
AIRWAY HEIGHTS CLOSED · 7am-7pm · (509) 798-8545
Est. 1979 | Also: Colville · Kettle Falls | ★ Military & First Responder Discount | Leave a Review
SHOP ONLINE — 60,000+ PRODUCTSMILWAUKEE TOOLS — IN STOCK NOWCONTRACTOR ACCOUNTS — EXCLUSIVE PRICINGBUY MORE SAVE MORE — VOLUME PRICINGFREE QUOTE — LUMBER & MATERIALSSERVING EASTERN WASHINGTON SINCE 1979SHOP ONLINE — 60,000+ PRODUCTSMILWAUKEE TOOLS — IN STOCK NOWCONTRACTOR ACCOUNTS — EXCLUSIVE PRICINGBUY MORE SAVE MORE — VOLUME PRICINGFREE QUOTE — LUMBER & MATERIALSSERVING EASTERN WASHINGTON SINCE 1979

How to Install Drip Edge and Ice Shield Guide for Eastern Washington Homeowners & Contractors

Why Drip Edge and Ice Barrier Are a System, Not Two Separate Products

If you’ve shopped for roofing materials at our Airway Heights, Colville, or Kettle Falls store, you’ve probably heard us talk about drip edge and ice barrier in the same breath. That’s intentional. These two components work together to manage water at the most vulnerable part of your roof — the edge — and installing one without thinking through the other is one of the most common mistakes we see, both from DIYers and from out-of-town crews unfamiliar with Eastern Washington winters.

The ice barrier (often called ice-and-water shield) stops wind-driven rain and ice-dam meltwater from reaching the sheathing. The drip edge takes that water and moves it into the gutter or safely away from the fascia. Install them out of sequence, and you can actually funnel water into places it was never supposed to go.

What Drip Edge Does

Drip edge is corrosion-resistant metal flashing installed along the eaves and rake (gable) edges of a roof. It protects the roof-deck edge and fascia, helps prevent shingle curling and rot, directs runoff into the gutter, reduces wind-driven rain intrusion behind the fascia, and gives you a clean, straight edge for shingles and underlayment.

Washington residential code requires drip edge at both eaves and rakes on shingle roofs. Adjacent sections must overlap at least 2 inches, extend a minimum of 1/4 inch below the sheathing, extend at least 2 inches onto the roof deck, and be mechanically fastened no more than 12 inches on center.

What Ice Barrier Does

An ice barrier is typically a self-adhering, polymer-modified bitumen membrane — “ice-and-water shield” in common parlance. It’s installed at eaves and other vulnerable spots to keep meltwater from backing up under shingles during ice-dam conditions, which we see plenty of across Spokane, Colville, and Kettle Falls most winters.

Code requires an ice barrier in areas with a history of ice damming along the eaves. The membrane must extend from the lowest roof edge to at least 24 inches inside the exterior wall line. On roofs steeper than 8:12, it must extend at least 36 inches measured along the slope from the eave. Keep in mind: 24 inches inside the wall line is not the same thing as 24 inches from the fascia. On a home with a wide overhang, that membrane may need to run considerably farther up the roof than you’d guess.

Answering the Questions We Hear Most at the Counter

Do I Really Need Ice Shield in Eastern Washington?

In practice, yes — especially anywhere in the Spokane area and up toward Colville and Kettle Falls where roofs collect snow, eaves sit in shade most of the day, attic insulation is thin, or the roof has a history of freeze-thaw cycling. The code requirement is tied to locations with a documented history of ice backup rather than blanket cold-climate rules, but realistically, most of our service area qualifies. Spokane’s own permitting materials specifically reference the 24-inch-inside-the-wall-line requirement and the accepted installation methods, so this isn’t optional guesswork — it’s enforced.

How Far Up the Roof Should the Membrane Go?

Use whichever is greater: the code-required 24 inches inside the exterior wall line, the membrane manufacturer’s instructions, or your own risk-based judgment for that specific roof. We routinely recommend extending coverage farther on low-slope sections, valleys, complex roof intersections, areas below roof-to-wall transitions, and anywhere that’s leaked before.

Does Ice Shield Go Over or Under the Drip Edge?

This trips up more DIYers than anything else. The correct sequence for a shingle roof:

Washington code is explicit about this reversal between eaves and rakes. Get it backwards and you can create a reverse lap that actually channels water under the membrane instead of over it.

Should Drip Edge Go Behind the Gutter?

No — the front leg of the drip edge should discharge water into the gutter, not behind it. This is specifically called out in regional building guidance. The right setup depends on your gutter design and fascia condition, and sometimes you’ll need to loosen or remove gutters temporarily to get the flashing installed correctly.

Can I Install This Over Existing Shingles?

Sometimes, but it’s a compromise. You’ll get a much better result during a full reroof, when old shingles, underlayment, and any damaged deck edge can be removed and inspected. Installing over existing shingles risks hiding rot, creating poor overlaps, and getting the underlayment sequence wrong.

Will Ice Shield Stop Ice Dams From Forming?

No — and this is important. Ice barrier limits water damage if an ice dam forms; it doesn’t prevent the dam itself. Ice dams are controlled by air sealing between the house and attic, adequate insulation, proper soffit-to-ridge ventilation, correctly routed bathroom and kitchen exhaust, sufficient roof drainage, and minimizing heat loss around skylights, chimneys, and attic hatches. If you’re dealing with recurring ice dams, the membrane is damage control, not a cure.

Is Synthetic Underlayment a Substitute for Ice Shield?

No. Synthetic underlayment sheds water but isn’t a substitute for the code-required self-adhering ice barrier. Code allows either two layers of underlayment cemented together or a self-adhering polymer-modified bitumen sheet for that ice-barrier function specifically — not a single layer of synthetic felt.

Materials: What to Buy and Why

Drip-Edge Materials and Profiles

Common drip-edge materials include galvanized steel, painted or coated steel, aluminum, and copper for premium or historically matched work. For Eastern Washington conditions, painted or galvanized steel is our most popular choice — it’s durable, widely stocked, and reasonably priced. Aluminum cuts easily but dents and creases more readily in handling. Copper is beautiful and long-lasting but expensive, and it needs to be paired with compatible fasteners and adjacent metals to avoid galvanic corrosion.

Profiles you’ll run into include standard Type D or “L” drip edge, extended-leg drip edge for wide fascia or gutter setups, wide-flange profiles for reroofing over thicker assemblies, and specialty gravel-stop edge metal for certain low-slope systems. A common item we move a lot of is 2-inch-by-10-foot black galvanized steel drip edge, typically running around $6 per 10-foot piece — though pricing shifts with gauge, finish, and market conditions, so check current pricing at any of our three locations.

Ice-Barrier Products

Self-adhering rubberized-asphalt or polymer-modified bitumen membranes come in several well-known product families. Selection should come down to compatibility with your roof covering, approved substrates, installation temperature range, whether a primer is needed, how long the membrane can sit exposed before shingles go on, and manufacturer approval for use around valleys, walls, chimneys, and skylights. Don’t assume every peel-and-stick product behaves the same — adhesion requirements, release films, and exposure limits vary by manufacturer.

Fasteners and Accessories

Stock up on galvanized roofing nails or corrosion-resistant fasteners, manufacturer-approved cap nails for membrane work, compatible primer for cold or dusty decking, quality roofing sealant for detail work, aviation snips, a sharp roofing knife with spare blades, and a hand roller for pressing membrane seams tight. Where the gutter-to-fascia transition needs it, pick up gutter apron or back-flashing too. Don’t substitute generic staples for roofing fasteners — they won’t hold the flashing tight enough.

What Makes Eastern Washington Different

Winter Conditions That Drive Ice Dams

Spokane, Colville, and Kettle Falls all see the classic ice-dam recipe: snow accumulation followed by a warm spell, then refreezing at shaded eaves overnight. North-facing slopes and roofs shaded by trees or neighboring structures hold snow and ice much longer than sunny south-facing slopes. We’ve seen plenty of roofs that perform fine on one side of the house and leak consistently on the other — same roof, same shingles, completely different outcome because of sun exposure and insulation evenness.

Hot, Dry Summers

Our summers bring a different set of stresses: high surface temperatures on dark shingles and metal, expansion and contraction in the flashing, rapid drying and shrinkage of exposed wood, and dust accumulation on roof decks. If you’re installing self-adhering membrane in July or August, stay within the manufacturer’s temperature range — rolls can get difficult to handle, wrinkle, or stick prematurely in extreme heat.

Wind, Debris, and Terrain

The Spokane area and the Columbia Basin to the west get their share of strong wind events and airborne debris. Make sure drip edge is securely fastened and properly overlapped — loose rake metal in a windstorm is a problem waiting to happen. Pine and fir needles common around Colville and Kettle Falls properties also clog gutters fast, which backs water up right at the eave exactly where you don’t want it.

Drainage and Foundation Considerations

Local soils vary across our service area, from denser clay to glacial deposits to rocky, granular ground. Soil type doesn’t usually change how you install the roof edge itself, but it matters a great deal for where that water ends up. Direct downspouts away from the foundation, avoid dumping concentrated flow against crawlspace walls, and check for basement or crawlspace moisture any time you change the roof drainage setup. A perfectly installed drip edge won’t save you if the gutter empties straight against your foundation.

Local Code and Permitting

Washington residential code establishes the core requirements: ice barriers where ice backup has historically occurred, a minimum 24-inch extension inside the exterior wall line (36 inches along the slope on roofs steeper than 8:12), drip edge at both eaves and rakes, minimum 2-inch overlaps, and fastening no more than 12 inches on center. Spokane’s permitting materials repeat these ice-barrier requirements specifically. Colville and Kettle Falls projects may fall under different local or county permitting offices, so confirm requirements before you start — code editions and local amendments do change.

Installation Sequence, Step by Step

Preparation

Remove enough roofing to expose the edge and decking, inspect the deck, fascia, and rafter tails for rot, and replace any damaged wood before anything new goes on. Clean the deck of dust, granules, and debris, confirm the roof edge is straight, and protect landscaping below while managing fall hazards appropriately.

Eave Drip Edge and Ice Barrier

Install the eave drip edge along the lower roof edge first, lapping adjacent pieces at least 2 inches and keeping the metal tight to the fascia without distorting it. Fasten no more than 12 inches on center. Then install the self-adhering ice barrier over the eave drip-edge flange, extending it far enough to meet the wall-line measurement. Press the membrane firmly along the edge and seams, stagger or seal end laps per product instructions, and watch for wrinkles, fishmouths, and open corners.

Field Underlayment

Install the remaining field underlayment after the eave ice barrier, keeping laps and drainage direction correct. Never create a reverse lap that could direct water beneath the membrane.

Rake Drip Edge

At the rakes, underlayment goes down first, then the rake drip edge goes over it — the opposite order from the eaves. Overlap joints at least 2 inches, extend the metal as the profile and shingle system require, and fasten without creating oil-canning or loose edges.

Valleys, Walls, and Penetrations

Add extra membrane or flashing at valleys, chimneys, skylights, dormers, roof-to-wall intersections, and plumbing penetrations. These spots fail far more often than a correctly installed eave, even on otherwise solid roofs.

Mistakes We See Often — and How to Avoid Them

The single biggest mistake is measuring ice-barrier width from the fascia instead of from inside the exterior wall line, which under-protects homes with a wide overhang. Close behind that is reversing the eave/rake sequence, skipping drip edge at the rakes entirely, laying membrane over dirty or damp decking, stretching peel-and-stick membrane so it shrinks back and wrinkles, and leaving membrane exposed to sun and weather longer than the product allows.

We also see drip edge installed with too few fasteners (it lifts in wind) or terminating behind the gutter instead of into it (water ends up behind the fascia, defeating the whole point). And please — don’t cover rotten decking or fascia with new flashing and shingles. It hides the problem and guarantees an earlier failure. If your project involves insulation or fascia repair alongside the roof edge work, make sure you’re not accidentally blocking soffit vents in the process; a continuous soffit-to-ridge airflow path is part of what prevents ice dams in the first place.

DIY or Call a Professional?

A low-slope, easily accessible roof section — a garage, a simple shed roof,

🛒 Shop Online